Deltek Costpoint Integration
Bidirectional Costpoint sync — WBS, rates, and T&E in; timesheets, POs, receipts out.
FORGE's Costpoint integration is built to keep the field and the back office in sync: it pulls WBS structures, labor rates, and travel-and-expense actuals, and pushes timesheets, purchase orders, and receipts. An OAuth2 connector and the sync and reconciliation logic are in place; production scheduling is in development.
CDRL cost exhibits are generated from the synced data, so the deliverables the government sees match the system of record. Reconciliation alerts flag labor and cost variances between FORGE and Costpoint.
- ▸Pull: WBS, labor rates, T&E actuals
- ▸Push: timesheets, POs, receipts
- ▸Generated CDRL cost exhibits
- ▸Reconciliation alerts on labor/cost variances
Common questions
FORGE's Costpoint integration is built to sync bidirectionally — pulling WBS, rates, and T&E actuals and pushing timesheets, POs, and receipts — and to generate CDRL cost exhibits from the synced data. The connector and sync logic are in place; production scheduling is in development.